LNG for vessels · fishing · tourism · coastal

From an ISO tank on the quay to the ship's fuel tank.

CF Energy brings LNG to where vessels come home: supply in ISO T75 tanks, bunkering by port cluster, safety surveys, MRV data and a financing model that does not require all the capital up front. No gas trading. No retrofit works.

Register a port-cluster pilot →
Why now

Any vessel that comes home regularly can do this.

Vietnam has a green-energy transition programme for transport (Decision 876/QĐ-TTg, 2022) and is drafting an emissions-reduction roadmap for its fleet. Dual-fuel engines are already on the market; the hard part is bunkering: where the vessel refuels, how often, and who is responsible if something goes wrong. The three vessel groups below all come home regularly, so those three questions can be answered: back in port on schedule, at a few fixed ports.

01 / OFFSHORE FISHING

Fishing vessels retrofitted to diesel–LNG dual-fuel

High-power vessels on long trips, with fuel the biggest cost of every voyage. Keep the diesel engine, add an LNG dual-fuel system; the fuel saved pays off the equipment over time.

  • Priority to vessels long enough to fit the tank and safety equipment, working enough days a year
  • Bunkering at the fishing-port cluster the vessels normally use — no scattered investment
  • Diesel, LNG and engine hours must be measured per trip to prove the benefit
Bunkering · fishing-port cluster, ISO T75 buffer, truck-to-ship
02 / BAY TOUR BOATS

Bay tour boats and coastal passenger vessels

Short routes, fixed schedules, back in port every night, operating in bays that need to stay clean. One bunkering point serves the whole fleet; less smoke, smell and noise right at the passenger pier.

  • Quayside station with a satellite tank or ISO swapped on schedule
  • Per-trip emissions record for a green tourism product
  • Easy to standardise because the fleet is similar in size and route
Bunkering · satellite tank at the pier, ISO swapped on schedule
03 / COASTAL VESSELS & BARGES

Coastal vessels and river–sea barges

North–South and river–sea routes have fixed end points, so bunkering at both ends is enough. Works alongside Nam Duong's barge fleet and CF Energy's ISO depots at Hai Phong and Cai Mep.

  • Bunkering at the end ports, sharing ISO depots with the plant routes
  • Safety files under maritime and registry rules
  • Preparing for lower-emission fuels after LNG
Bunkering · both route ends, shared depots
Supply chain

Five things must be in place. CF Energy does three.

LNG only gets onto a vessel when all five items below run together. LNG supply is the importer's job; the engine is the yard's and the technology supplier's. CF Energy does the three in the middle — the same part it already does for plants on land.

TIER 1

LNG supply

Import terminals, importers and LNG cargo owners.

TIER 2 · CF ENERGY

Storage / station at the port cluster

ISO T75 as mobile buffer or a fixed satellite tank at fishing-port clusters, tourist piers and coastal ports.

TIER 3 · CF ENERGY

Bunkering

Truck-to-ship, ISO-to-ship or from a quayside station; safety procedure, ESD, gas detection, exclusion zone.

TIER 4

Engine engineering

Retrofit and maintenance of the dual-fuel system — technology partners and certified yards under registry rules.

TIER 5 · CF ENERGY

Data & MRV

GasTwin™ logs diesel, LNG, engine hours and route per voyage; reports to owners, banks and regulators.

How we work

From the fleet to the first bunkering.

No one-size retrofit for every vessel, and no station built before there are enough vessels. Each port cluster goes through five steps; each step ends with a document that owners, banks and regulators can all see.

01 / SCREENING

Score the fleet

Length, power, operating days, diesel consumption, engine age, distance to the bunkering point, ability to repay.

02 / SURVEY

Measure each vessel's baseline

Vessel and engine files, tank space, ventilation, fire safety; actual diesel used per trip.

03 / DESIGN

Bunkering & safety plan

Bunkering location, ISO/satellite-tank configuration, bunkering procedure; retrofit file prepared by the partner and submitted to the registry.

04 / PILOT

Supervised trial

Leak test, pressure test, ESD test; monitor at least one full operating cycle.

05 / SCALE

Decide on data

Assess safety, economics and environment; expand cluster by cluster where it works, upgrade the station once volume proves it.

Safety first, everything else after

  • LNG on board is a major change to the fuel system — not "a different kind of oil"
  • Tank, supply lines, forced ventilation, leak detection, emergency shut-off valves, hazardous zones: designed, reviewed, tested and certified under the applicable rules
  • Bunkering procedure with exclusion zone, pre-transfer checks, emergency stop and response plan
  • Crew and station operators trained before the first bunkering

Owners do not have to put up all the capital

  • ESCO / shared savings: CF Energy or a partner invests in bunkering and storage equipment; the owner pays out of the fuel saved
  • Equipment lease: tanks, skids and bunkering stations charged monthly, tied to a long-term supply contract
  • Green credit: per-voyage MRV data is the file banks and climate funds assess
  • Every payback figure is calculated on each vessel's real data, not a blanket factor
Measurement

Measure first, then scale.

How much LNG helps must be measured on board, not estimated from factors. Unburned methane (methane slip) must be counted, otherwise the emissions figure looks better than reality. GasTwin™ logs the fields below per voyage and exports reports in one format.

GroupMetrics trackedUsed for
FuelDiesel and LNG per voyage / period; actual substitution rateNet saving; reconciliation against the sharing contract
OperationsEngine hours, engine load, route, number of bunkerings, bunkering timeNormalise consumption intensity; schedule bunkering
SafetyLeak alarms, fire incidents, procedure compliance, downtimeCondition for expanding the cluster
EnvironmentCO₂e by an approved method; NOx / SOx / PM where measurable; methane slipGreen-credit and carbon-credit files
Supply chainLNG fulfilment rate, logistics cost per tonne, minimum stockStation upgrade decision
Why CF Energy

Most of it is already there.

ISO tanks, the tractor fleet, port operators, river–sea barges, the measurement platform — CF Group already has all of it to serve plants on land. Taking it to vessels is extra use, not new investment.

SHARED INFRASTRUCTURE

Same ISO T75 fleet, same depots

A tank supplying a plant by day can sit as buffer at a fishing port by night. The ISO depots at Hai Phong and Cai Mep are two ready starting points for the coastal route.

BOTH ENDS OF BUNKERING

Long River on the quay, Nam Duong on the river

The port crane operator and the barge operator are both group companies — the bunkering procedure is written with the people who will actually do it.

MEASUREMENT IN PLACE

MQ ICT for MRV

The AI/IoT monitoring platform exists; GasTwin™ only adds vessel data fields, not a new system.

Member figures from cfg.vn. Policy context: Decision 876/QĐ-TTg of 22 July 2022 — Action programme on green-energy transition and reduction of carbon and methane emissions in the transport sector.

FAQ

Ask before asking for a price.

Does CF Energy do vessel retrofits?

No. Retrofit design and installation are done by technology partners and certified yards under registry rules. CF Energy surveys, secures LNG supply, bunkers, handles safety at the transfer point and MRV data. Not doing the on-board part is what lets CF Energy work with every technology supplier.

Is my vessel suitable?

Best suited are vessels long enough to fit the tank and safety equipment, with high power, many operating days a year, high diesel consumption, and regularly calling at a port cluster where bunkering can be organised. Exact thresholds are set from each vessel's real data after survey, not from a fixed template.

How long does bunkering take and what is needed at the pier?

It depends on the configuration: transfer from an ISO or road tanker needs a hard standing for vehicle access, an exclusion zone, dedicated connection equipment and trained operators; a fixed quayside station shortens the time and serves the whole fleet. Bunkering time is fixed in the technical plan for each cluster.

Who is responsible for safety during bunkering?

CF Energy is responsible for the procedure and equipment at the transfer point — pre-transfer checks, exclusion zone, emergency stop, gas detection. The on-board fuel system falls under the registry-certified design. The boundary of responsibility is written into the contract and the coordination procedure.

Can the greenhouse-gas benefit be quantified?

Yes, but it must be measured on board: actual diesel and LNG used, engine hours, and unburned methane. GasTwin™ logs per voyage and reports by a method approved by the competent authority. CF Energy does not publish benefits from theoretical factors.

Does the owner have to fund everything?

Not necessarily. Bunkering and storage equipment can be invested by CF Energy or a partner under an ESCO or equipment-lease model; the on-board retrofit can access green credit with the MRV file. The exact structure depends on the number of vessels in the cluster and the actual savings data.

Have a fleet and a port? Start with one port cluster.

Send your fleet details, usual ports and current diesel use. CF Energy replies with a preliminary bunkering plan for your port cluster.

Register a pilot →