Does CF Energy do vessel retrofits?
No. Retrofit design and installation are done by technology partners and certified yards under registry rules. CF Energy surveys, secures LNG supply, bunkers, handles safety at the transfer point and MRV data. Not doing the on-board part is what lets CF Energy work with every technology supplier.
Is my vessel suitable?
Best suited are vessels long enough to fit the tank and safety equipment, with high power, many operating days a year, high diesel consumption, and regularly calling at a port cluster where bunkering can be organised. Exact thresholds are set from each vessel's real data after survey, not from a fixed template.
How long does bunkering take and what is needed at the pier?
It depends on the configuration: transfer from an ISO or road tanker needs a hard standing for vehicle access, an exclusion zone, dedicated connection equipment and trained operators; a fixed quayside station shortens the time and serves the whole fleet. Bunkering time is fixed in the technical plan for each cluster.
Who is responsible for safety during bunkering?
CF Energy is responsible for the procedure and equipment at the transfer point — pre-transfer checks, exclusion zone, emergency stop, gas detection. The on-board fuel system falls under the registry-certified design. The boundary of responsibility is written into the contract and the coordination procedure.
Can the greenhouse-gas benefit be quantified?
Yes, but it must be measured on board: actual diesel and LNG used, engine hours, and unburned methane. GasTwin™ logs per voyage and reports by a method approved by the competent authority. CF Energy does not publish benefits from theoretical factors.
Does the owner have to fund everything?
Not necessarily. Bunkering and storage equipment can be invested by CF Energy or a partner under an ESCO or equipment-lease model; the on-board retrofit can access green credit with the MRV file. The exact structure depends on the number of vessels in the cluster and the actual savings data.